H.C Building & Construction were engaged to document and construct the new Kowanyama Airport Terminal. The new building is an iconic feature of the town, designed and built in a unique airplane-shaped design. The building was architecturally designed. The project took 4 months to complete.
| Location | Kowanyama |
|---|---|
| Client | Kowanyama Aboriginal Shire Council |
| Duration | 4 Months |
© H.C Building & Construction 2026